Start/Stop Seal-In Circuit Explained: Contactor Wiring and PLC Ladder Logic

How a start/stop seal-in circuit works, wired with a contactor and written in PLC ladder logic: terminal numbers, 3-wire control, multiple stations, jog, feedback checks and fault finding.

Start/Stop Seal-In Circuit Explained, Bob Teaches Tech featured image

A seal-in circuit keeps a contactor or PLC output switched on after you release a momentary Start button, by feeding power through a contact of that same output wired in parallel with Start. Pressing Stop, or an overload trip, breaks the circuit, the output drops out, and it stays out until someone presses Start again.

You will also hear it called a holding circuit, a latching circuit or 3-wire control. My ladder logic tutorial uses the seal-in as a first PLC program. This post goes further: the hard-wired version with real terminal numbers, why it is safer than a simple on/off switch, and the PLC patterns you need on real machines, with multiple control stations, jogging and a contactor feedback check.

How a seal-in circuit works

The whole idea fits in one Boolean line:

Motor = (Start OR Motor) AND Stop AND Overload

Start is a momentary normally open button. Stop and Overload are normally closed devices, so they read 1 while everything is healthy. When Start closes, the Motor output turns on. The Motor contact in parallel with Start now closes too, so when you let go of Start the output is still fed through its own contact. It has sealed itself in. Opening Stop or Overload breaks the series path, the output turns off, its own contact opens, and the seal is gone.

The hard-wired version: 3-wire control

Before PLCs, every motor starter was built like this, and most still are. It is called 3-wire control because three wires run from the starter to the push button station: the supply, the line to the coil, and the seal-in connection between them.

Hard-wired 3-wire start/stop control circuit: stop push button NC 11-12, start push button NO 13-14 with contactor auxiliary contact 13-14 in parallel, overload contact 95-96 and contactor coil A1-A2
Figure 1. Hard-wired 3-wire control. The K1 auxiliary contact (orange) bypasses the Start button once the contactor pulls in.
Device Terminals Contact Job
S0 Stop push button 11–12 Normally closed Breaks the circuit when pressed
S1 Start push button 13–14 Normally open Energises the coil when pressed
K1 auxiliary contact 13–14 Normally open Seal-in: bypasses Start once K1 pulls in
F2 thermal overload relay 95–96 Normally closed Opens when the motor current is too high for too long
K1 contactor coil A1–A2 Coil Closes the main power contacts to the motor

The terminal numbers follow the usual European marking for control contacts: the last digit 1–2 marks a normally closed contact and 3–4 a normally open one, while 95–96 and 97–98 are the overload relay’s normally closed and normally open auxiliary contacts. Check your device’s datasheet, because some push buttons ship as 1–2 and 3–4 instead.

Follow the current when the motor is running: from the fused supply, through the closed Stop button, through the K1 auxiliary contact (Start is open again), through the overload contact, into A1, out of A2 to neutral or 0 V. Press Stop and the path is broken; K1 drops out and its auxiliary contact opens, so releasing Stop does not restart the motor.

Why 3-wire beats 2-wire control

The alternative is 2-wire control: a maintained switch, thermostat or float switch that sits in series with the coil and stays closed. It is simpler, but it behaves very differently after a power cut.

2-wire control 3-wire control (seal-in)
Control device Maintained switch, thermostat, float switch Momentary Start and Stop buttons
After a power cut Restarts on its own when power returns (low-voltage release) Stays off until Start is pressed (low-voltage protection)
After the overload is reset May restart immediately Stays off until Start is pressed
Good for Pumps, fans and heaters that should restart unattended Machines with people nearby: conveyors, mixers, machine tools

That “stays off after a power cut” behaviour is the main reason the seal-in exists. A lathe or conveyor that restarts by itself when the lights come back on can hurt someone.

The PLC version of the seal-in circuit

In a PLC panel the push buttons become inputs and the contactor coil is driven by an output. The seal-in moves into the program: instead of a K1 auxiliary contact, you use a contact on the motor’s own output bit.

Tag Address Device and wiring
Start_1 I0.0 Local Start button, NO
Stop_1 I0.1 Local Stop button, NC
Overload I0.2 Overload relay 95–96, NC
Feedback I0.3 Contactor auxiliary contact, NO (closed when K1 is pulled in)
Start_2 I0.4 Remote Start button, NO
Stop_2 I0.5 Remote Stop button, NC
Reset I0.6 Fault reset button, NO
Motor Q0.0 K1 contactor coil (through an interposing relay if the coil is larger than the output rating)
Fault M0.1 Internal bit: contactor did not respond
PLC ladder logic seal-in circuit with two start and two stop stations, overload input, fault interlock and a contactor feedback check using a 2 second TON timer
Figure 2. PLC version with two control stations. Rungs 2 to 4 latch a fault if the contactor does not confirm within 2 s.

Rung 1 is the seal-in itself. Notice that all the normally closed devices are programmed with normally open contacts: the contact tests the input bit, and a healthy NC device gives a 1. If a wire to a Stop button breaks, the input drops to 0 and the motor stops, which is the fail-safe result you want. The full symbol list is in my ladder logic symbols cheat sheet.

Also check the output rating before you wire a contactor coil straight to the PLC. Many transistor outputs are rated around 0.5 A, and AC coils need a relay output or an interposing relay. A small 24 V DC interposing relay is cheap insurance for the PLC output.

Multiple start and stop stations

A long conveyor often has a control station at each end. The rule is the same for hard-wired and PLC circuits: Start buttons go in parallel, Stop buttons go in series. Any Start can start the motor; any Stop can stop it. That is rung 1 of Figure 2.

Action Start_1 Start_2 Stop_1 Stop_2 Motor
Idle 0 0 1 1 0
Remote Start pressed 0 1 1 1 1
Remote Start released 0 0 1 1 1 (sealed)
Local Stop pressed 0 0 0 1 0
Local Stop released 0 0 1 1 0 (stays off)

Adding a contactor feedback check

The PLC only knows it switched Q0.0 on. It does not know whether the contactor actually pulled in. A blown coil fuse, a broken wire or a welded contact can leave the program and the machine disagreeing. Rungs 2 to 4 in Figure 2 catch that:

  • Rung 2: if Motor is on and the Feedback input is still off, the TON T_FB starts timing.
  • Rung 3: after 2 s with no feedback, the Fault bit is set.
  • Rung 4: the Reset button clears the fault.

Because Fault sits in rung 1 as a normally closed contact, a latched fault drops the Motor output and blocks restarting until it is reset. Two seconds is generous for a contactor, which normally closes within a few tens of milliseconds; adjust it to your hardware. The timer behaviour is explained in PLC timers: TON, TOF and TP.

Some engineers seal in on the Feedback input instead of the output bit. That copies the hard-wired behaviour exactly: if the contactor drops out for any reason, the run command is forgotten. Both approaches work; what matters is that you choose one deliberately.

Adding a jog (inch) button

A jog button runs the motor only while it is held, for threading a belt or lining up a machine. The trap is that if Jog drives the Motor output directly, the seal-in contact on Motor will latch it on. Split the logic into a run latch and the output:

  • Run_Latch = (Start OR Run_Latch) AND Stop AND Overload
  • Motor = (Run_Latch OR Jog) AND Stop AND Overload

Jog turns the output on but never touches Run_Latch, so the motor stops the moment Jog is released. In a hard-wired starter you get the same result with a jog/run selector switch that opens the seal-in path.

Stop priority versus start priority

What should happen if someone presses Start and Stop at the same time? The position of the Stop contact decides it.

Circuit Boolean Start and Stop pressed together
Stop priority (Stop in series after the branch) (Start OR Motor) AND Stop Motor off
Start priority (Start branch bypasses Stop) Start OR (Motor AND Stop) Motor on

Use stop priority for anything that moves. Start priority means a stuck Start button makes the Stop button useless. You can try both versions in the Ladder Lab simulator: load Start / stop with seal-in, hold Start and press Stop, and the motor stays off.

Troubleshooting a seal-in circuit

Symptom Likely cause What to check
Motor runs only while Start is held Seal-in path missing or open Wire on K1 13–14 (hard-wired); seal-in contact address in the PLC rung
Motor runs only while Stop is pressed (PLC) NC Stop button programmed with an NC contact Change the Stop contact to normally open
Motor will not stop Stop wired in parallel, start priority logic, or welded contactor Stop must be in series; check main contacts with power isolated
Contactor chatters Coil voltage wrong or supply sagging, loose seal-in wire Measure coil voltage while pulling in; tighten terminals
Motor restarts by itself after a power cut 2-wire control, or a retentive SET bit in the PLC Use a seal-in, or clear the latch on power-up
Trips on overload soon after starting Overload set below the motor current or wrong range Set to motor nameplate full-load current

For the last one, the motor full-load current calculator gives a quick estimate from kW, voltage, power factor and efficiency, but always set the overload to the nameplate current when you have it.

A note on emergency stops

A seal-in Stop button is an operational stop, not an emergency stop. An emergency stop must remove energy through a hard-wired safety circuit or safety relay designed to the relevant machinery safety standards. The PLC can read its status for display and sequencing, but it should not be the only thing between the button and the motor.

Where to go next

For a classic textbook treatment of relay motor control with the same seal-in contact, see the motor control circuits chapter of Lessons in Electric Circuits.

Frequently asked questions

What is the difference between a seal-in and a latch?

A seal-in holds an output on through its own contact, so it drops out as soon as power or the stop path is lost. A latch (SET/OTL) stores the state in memory and holds it until a reset instruction, and if the bit is retentive it can even survive a power cycle.

Why is the stop button normally closed?

So that the circuit fails safe. If the wire to a normally closed Stop button breaks or a terminal works loose, the circuit opens exactly as if Stop were pressed, and the motor stops instead of becoming impossible to stop.

What is 3-wire control?

3-wire control is a motor starter circuit with momentary Start and Stop buttons and a holding contact on the contactor. Three wires run to the button station. The motor does not restart by itself after a power failure.

What is a holding contact?

A holding contact is the normally open auxiliary contact of the contactor, or the output’s own contact in a PLC program, wired in parallel with the Start button. Once the contactor pulls in, the holding contact keeps the coil energised after Start is released.

Can I use SET and RESET instead of a seal-in in a PLC?

Yes, but think about power loss and priority. A retentive SET bit can restart a motor after a power cut, and with SET and RESET on separate rungs the lower rung wins. For motors, a seal-in rung with stop priority is the safer default.

Keep going

Want the next tutorial in your inbox? Join the newsletter, one practical tutorial a week, or download the free eBook Introduction to Ladder Logic Programming and I/O Configuration from the resources library.

About The Author

Stuck on a step? Ask here

Include your PLC model and software version if you can. Your email is never published.